{"id":51620,"date":"2018-08-10T20:03:20","date_gmt":"2018-08-10T14:33:20","guid":{"rendered":"https:\/\/woodandpanel.com\/?p=51620"},"modified":"2018-08-10T20:05:02","modified_gmt":"2018-08-10T14:35:02","slug":"weinig-group-launches-10-million-euro-new-building-project-in-nurtingen","status":"publish","type":"post","link":"https:\/\/www.woodandpanel.com\/woodnews\/article\/weinig-group-launches-10-million-euro-new-building-project-in-nurtingen\/","title":{"rendered":"WEINIG Group launches 10 million euro building project in N\u00fcrtingen"},"content":{"rendered":"

\"WEINIG_Nuertingen_Invest\"<\/a>The WEINIG Group has launched one of the largest construction projects in the recent WEINIG history at the N\u00fcrtingen location with the traditional ground-breaking ceremony. The newly designed headquarters of subsidiary Holz-Her will be built by autumn 2019 for an investment sum of 10 million euros.<\/p>\n

 <\/p>\n

The strong growth of the Panel Processing business unit in recent years was the decisive factor for this decision. In addition, the number of employees doubled in the last eight years. The existing structural solution no longer met the increasing requirements.<\/p>\n

 <\/p>\n

A spacious, modern building complex is now being built in the \u201cGro\u00dfer Forst\u201d industrial estate on a total area of 5,800 sqm. It provides sufficient capacity to concentrate sales, technology, development, service and administration \u201cunder one roof\u201d. The heart of the new building is a 1,400 sqm showroom. A technology center with training rooms and the administration wing will also be located there. During the planning phase, the focus was on the shortest possible routes. In accordance with the basic architectural idea, the new building, measuring 70 x 50 metres, has a continuous floor slab on which the of-fice area and a special hall construction are arranged directly next to each other. Its outstanding stylistic element is a wooden frame that spans the 30-metre wide hall without supports. Visually, the architecture is characterized by a particular lightness. The high strength of the selected composite material plays a significant role in achieving this effect. The so-called \u201cBauBuche\u201d (laminated beech veneer lumber) allows much slimmer components than softwood composites. An integral part of the concept is the option of subsequent structural modifications without great effort.<\/p>\n

 <\/p>\n

Future building measures of the WEINIG Group will be carried out according to the same CI specifications. 85 employees will move into the new building. The building project is actually designed for as many as 125 employees. Holz-Her thus retains sufficient flexibility to be able to respond to increasing space requirements. The surrounding area also offers space for expansion: In a further expansion stage, an additional area of 1,500 to 2,500 sqm can be developed and built upon in the open field.<\/p>\n

 <\/p>\n

The groundbreaking ceremony was characterized by a strong sense of departure. An extension to the Holz-Her production plant in Voitsberg, Austria, was started only last September. With its investment at the headquarters of Holz-Her, the WEINIG Group has now started the second forward-looking project in the latest success story of the panel processing specialist. \u201cHolz-Her has made a great development since joining the WEINIG Group in 2010,\u201d WEINIG CEO Wolfgang P\u00f6schl em-phasized in N\u00fcrtingen. This is also reflected in the large investment, he said. Frank Epple, Managing Director of Holz-Her GmbH, particularly pointed out the potential that the new building opens up: \u201cThe functional integration of sales, customer presentations and administration into one building will ensure maximum customer proximity and the highest level of support in the future,\u201d he said. Since its integration into the WEINIG Group in 2010, Holz-Her has tripled its sales to approximately EUR 120 million in 2017. However, this is only intended to be an inter-mediate stage: \u201cToday was the starting signal for further growth\u201d, Frank Epple was confident.  <\/p>\n","protected":false},"excerpt":{"rendered":"

The WEINIG Group has launched one of the largest construction projects in the recent WEINIG history at the N\u00fcrtingen location with the traditional ground-breaking ceremony. The newly designed headquarters of subsidiary Holz-Her will be built by autumn 2019 for an …<\/p>\n","protected":false},"author":20,"featured_media":51621,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_links_to":"","_links_to_target":""},"categories":[25,16322,40,20836,10443],"tags":[21456,26191,11876,16784,16826],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.woodandpanel.com\/wp-json\/wp\/v2\/posts\/51620"}],"collection":[{"href":"https:\/\/www.woodandpanel.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.woodandpanel.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.woodandpanel.com\/wp-json\/wp\/v2\/users\/20"}],"replies":[{"embeddable":true,"href":"https:\/\/www.woodandpanel.com\/wp-json\/wp\/v2\/comments?post=51620"}],"version-history":[{"count":0,"href":"https:\/\/www.woodandpanel.com\/wp-json\/wp\/v2\/posts\/51620\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.woodandpanel.com\/wp-json\/wp\/v2\/media\/51621"}],"wp:attachment":[{"href":"https:\/\/www.woodandpanel.com\/wp-json\/wp\/v2\/media?parent=51620"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.woodandpanel.com\/wp-json\/wp\/v2\/categories?post=51620"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.woodandpanel.com\/wp-json\/wp\/v2\/tags?post=51620"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}