Wood & Panel
Home » Featured News » Greenply manufactures first Board from Dieffenbacher

Greenply manufactures first Board from Dieffenbacher

 Wednesday, April 25, 2018

Greenply1Greenply Industries Ltd. has produced the first board on its new MDF plant in Chittoor District, Andhra Pradesh, India. The new line is the second MDF project that the Indian wood-based panel producer and the Eppingen-based plant manufacturer have completed together. The first plant was commissioned in 2009.

 

At 56 meters long, the Dieffenbacher CPS at the core of the plant is the longest continuous press in Asia. Other plant components ordered from Dieffenbacher in 2015 were a fiber dryer, two SGF sifters, a gluing system, forming station—including a scalper with a correction module, a forming line and finishing line with triple diagonal saw, two Lukki storage systems, and a sanding line with cut-to-size saw and exhaust system.

 

On its new line, Greenply produces 1,400 m³ of high-quality MDF per day. As raw material, mainly fast-growing woods such as eucalyptus will be used.

 

 

Tags: , , , , , , , , , , , , , , , , , , , ,

Comments:

Read Magazine Online

Subscribe to our Newsletters

I want to receive wood industry news and event update from Wood & Panel. I have read Wood & Panel Privacy Notice.

Our Partners

medwood

LINKEDIN